I really like the breakdown, Mike. I've actually created a graph with the estimates created from Gerr (from his book), Eric's feedback-based calculations from this list, and your experience-based calculations from building production systems. I built a quick non-linear regression to fit a simple curve, then used it to predict a set of common values. (I'll try to embed it below, but the normal upload to the forum isn't working. I was able to add it as an attachment.)
<iframe src="https://onedrive.live.com/embed?cid=43E138DD07867FEC&resid=43E138DD07867FEC%21783958&authkey=AN-HKz8cZ1kjgDg" width="320" height="142" frameborder="0" scrolling="no"></iframe>
Thanks again, Mike!
_._,_._,_
Groups.io Links:
You receive all messages sent to this group.
View/Reply Online (#30772) | Reply To Group | Reply To Sender | Mute This Topic | New Topic
Your Subscription | Contact Group Owner | Unsubscribe [newarmyguitar24@gmail.com]
_._,_._,_
No comments:
Post a Comment